Excavation and preparation: excavate trenches according to the design drawings and compact the base layer.
Laying cushion layer: Lay a concrete cushion layer and find the drainage slope.
Assembly and placement: Assemble the groove module (usually with socket and sealing ring), connect the water outlet, and place it in the groove.
Fixing and pouring: Pour concrete on both sides of the trench for fixing and sealing.
Install cover plate: After the concrete reaches its strength, cover the cover plate.