Hot melt butt installation:
①Clean the heating plate, set the heating temperature to 220+10℃, and keep it warm for ten minutes
②Fix the pipes to be welded (pipe fittings)
③ Use a milling cutter to mill the end face of the pipe (pipe fitting)
④Check the coaxiality of the pipe
⑤Butt the pipe and the pipe, keep the pressure for 15 minutes, until the pipe is cooled
⑥The pipe and the heating plate collide with each other, forming a flanging around the pipe, the pressure drops to 0, and it starts to absorb heat, and the time is 10-12 times the wall thickness
Electrofusion installation:
① Before welding, select the appropriate welding voltage according to the marking parameters on the pipe fittings, the voltages are 220V and 380V
②Clean the pipe
③Identification insertion length
④Scrape off the oxide layer
⑤Clean the pipe
⑥Assembly
⑦Welding