News

Super Projects | Accelerate infrastructure construction and build dreams to flow in China

 Time goes on, time goes by, 2025 Spring Festival transportation is about to open. With the recovery of the economic

situation, tourism, visiting relatives and returning home are intertwined, and the continuous extension of the rail carries

the hopes of countless travelers, and the passenger flow of high-speed rail stations has been greatly increased year by year.

Against the backdrop of the orderly progress of infrastructure construction, as one of the country's major infrastructure

projects, the railway serves as the main artery of the national economy and a significant livelihood project. Guided by

the responsibility for the people's happy lives and building a powerful country in infrastructure, ERA helps create a

mobile China where "goods flow smoothly and people enjoy their trips", fulfilling the dream of family reunions and

enabling the "convenient Spring Festival travel rush" to support people's journeys.

【Hangzhou West Station】

With the design concept of "City of Clouds" and a total floor area of over 510,000 square meters, this platform is an

intermediate station on the Hefei-Hangzhou High-Speed Railway and the Hangzhou-Wenzhou High-Speed Railway.

In 2024, the total number of passengers sent by Hangzhou West Station during the Spring Festival travel rush

increased by more than 130% year-on-year, and the transportation demand will be even stronger in the Spring

Festival travel rush in 2025.

When viewed from the air, this high-speed railway platform, which combines the imagery of the regions south of the

Yangtze River and the characteristics of Hangzhou's Internet industry, is magnificent, like a sea of clouds. At 0:00 on

January 5, 2025, high-speed trains traveling between Hangzhou West Station and Hong Kong West Kowloon were

opened for the first time, further connecting with the world.

Due to the huge passenger flow demand of this engineering project, high requirements are also placed on products.

ERA's HDPE double-wall corrugated pipes have excellent compressive performance, and their smooth inner walls

enable them to exert their advantages even in deep-buried environments, supporting the stable operation of the

water supply and drainage system of Hangzhou West Station.

【Nanchang East Station】

With a floor area of 220,000 square meters, Nanchang East Station is the intersection station of the Beijing-Hong Kong

High-Speed Railway and the Hangzhou-Changsha High-Speed Railway. In recent years, with the gradual completion

of the road network projects, Nanchang has further expanded its regional development space. According to the data

of the 2024 Spring Festival travel rush and the predictions of the railway department, during the 2025 Spring Festival

travel rush, Nanchang East Station is expected to send 160,000 passengers, connecting thousands of families.

To ensure the high-quality progress of the project, ERA's water supply and drainage series products such as PVC-U

drainage pipes, PPR water supply pipes, and HDPE steel mesh skeleton composite pipes are applied therein,

demonstrating excellent stability in deeply buried underground areas such as the high-speed railway station

buildings and station yards, and easily coping with complex water pressure conditions. 

【Longchang-Huangtong Railway Project】

The Longchang-Huangtong Railway starts from Longchang, Sichuan in the north and ends at Huangtong, Guizhou in

the south, with a total length of 497.4 kilometers. It is a railway planned and constructed as early as in "The International

Development of China" by Dr. Sun Yat-sen. After the connection of the Longchang-Xuyong section of the railway, it will

become an important node project for Luzhou City to fully promote four-directional expansion, all-round opening up,

and highlighting the southward orientation. Against the backdrop of the expected record high in the cross-regional

population flow across the whole society, the Longchang-Huangtong Railway will carry the homecoming dreams of

more travelers.

ERA's HDPE water supply pipes have superior properties such as high toughness, crack resistance, and

low-temperature resistance. In particular, their elongation at break exceeds 350%, avoiding the condition

limitations of ordinary pipes that are prone to low-temperature embrittlement in the western environment,

and efficiently supplying water for the entire Longchang-Huangtong Railway Project.

Shanghai Hongqiao Station, Kunming South Station, Suzhou North Station, Qingdao Hongdao Station, Zhejiang

Yueqing Bay Railway Project... ERA serves the strategic needs of the country and deeply cultivates the infrastructure

field. From transportation hubs to bridge venues, from water and electricity networks to photovoltaic new energy,

ERA helps boost infrastructure facilities to "upgrade and accelerate", injecting strong impetus into the "reunion year".


Back To List